Roel
roelvanderkraan.nl
Roel
@roelvanderkraan.nl
UX designer at ZorgDomein
Indie iOS app developer
🏳️‍🌈 🛹🏂 🎹 🛶 🕹️ 🌸 ⛰️

📇 Building gethippo.app, a personal CRM
📲 roelvanderkraan.nl
Woensdag stem ik voor @partijvoordedieren.nl! Minder vervuiling, meer groen! Geen dierenleed, wel dierenrechten! 💚
October 25, 2025 at 10:53 AM
My first go at Lego blockprinting, a lot of fun!
August 27, 2025 at 3:18 PM
I modified the cable clip size a bit so now they fit Jaspers Synth Racks! Now in my Etsy store:

standmods.etsy.com/listing/4345...

#jaspers #synth #cablemanagement #etsy
August 3, 2025 at 7:43 PM
🎉 Excited to share the latest addition to my #Etsy shop:
Pack of Cable Clamps for BlackPantherSystem PARA & CEDRO stands

🛒 etsy.me/4lSa4sJ

#keyboardstand #blackpanthersystem #black #cableclamp #cableclip #cablemount #midicableorganizer #audiocableclip #synthcableclip
July 28, 2025 at 5:51 PM
So sad all these animals in captivity that cling to stuffed toy animals for a bit of love... 😢

www.volkskrant.nl/kijkverder/v...
January 31, 2025 at 10:01 AM
Some stills:
January 16, 2025 at 4:07 PM
Genuary 14: Pure black and white. No gray.
#genuary #genuary14 #genuary2025 #genart
January 16, 2025 at 4:07 PM
#Genuary11: Try to do something that feels impossible for you to do.
I wanted to recreate the sci-fi city illustrations that I love. I'm nowhere near what I wanted to make. I render buildings with perpective projection. Height, depth and color are randomized.
#Genuary #genuary2025 #SwiftUI
January 12, 2025 at 7:52 PM
For Genuary 11 the prompt is to try the impossible, I'm trying to draw my own perspective cubes in 2D and well it is quite impossible until now, but I'm getting close. #Genuary11
January 11, 2025 at 7:49 PM
January 10, 2025 at 4:08 PM
Genuary 10: You can only use TAU in your code, no other number allowed.
This was hard, I don't know what I did but somehow it turned out to be a cool ray visualization :D

TAU = 2 * pi = 6.2831853…
#genuary #genuary10 #genuary2025
January 10, 2025 at 4:08 PM
The fabric from old seats is being upcycled by NS into meditation cushions and pencil bags.
January 9, 2025 at 4:38 PM
Genuary 9: The textile design patterns of public transport seating.

Inspired by the NS seating (dutch railway). Made in #SwiftUI

#genuary #genuary9 #genuary2025 #genart #art #digitalart #generative #ProceduralArt
January 9, 2025 at 4:38 PM
Genuary 8: Draw one million of something.

One million animals are slaughtered in the Netherlands every 16 hours and 30 minutes. veganuary.com

#Genuary #Genuary8 #Genuary2025 #SwiftUI
January 8, 2025 at 3:16 PM
Genuary 7: Use software that is not intended to create art or images.
I used Reason to make generative music, visualizing it with a few spectrometers.

#Genuary #Genuary2025 #Genuary7 #genart #generative #ProceduralArt
January 7, 2025 at 2:31 PM
Genuary day 6: Make a landscape using only primitive shapes. After some tinkering I decided to go for mountains made of triangles. Made in #SwiftUI

#genuary #genuary6 #genuary2025 #genart #generative #ProceduralArt
January 6, 2025 at 5:53 PM
Genuary 5: Isometric Art (No vanishing points). Made in
#SwiftUI

#genuary #genuary5 #genuary2025 #genart #art #digitalart #generative #ProceduralArt
January 5, 2025 at 1:26 PM
Trying out generative art in SwiftUI for the first time #genuary #genuary4
Prompt was: Black on black.
January 4, 2025 at 7:50 PM