“The smart, transit-oriented [social media] account” -Chicago Tribune
Planning, building, breaking, rebuilding.
(5 stations (not counting Division/Elston) x $444m = $2.22B, 3.1 miles of tunnel at $1B = $3.1B, $5.32B vs $5.75B RLE)
(5 stations (not counting Division/Elston) x $444m = $2.22B, 3.1 miles of tunnel at $1B = $3.1B, $5.32B vs $5.75B RLE)
🔗 PDF: yardsocial.wordpress.com/wp-content/u...
🔗 PDF: yardsocial.wordpress.com/wp-content/u...
Tell @govpritzker.illinois.gov to sign SB2111 as-is, and tell the future NITA board: let's #BuildTheTunnel.
Tell @govpritzker.illinois.gov to sign SB2111 as-is, and tell the future NITA board: let's #BuildTheTunnel.
1️⃣ Reconfiguration of the A-2 Interlocking
2️⃣🅰️ Direct RI-CUS connection with riverside thru-running
2️⃣🅱️ Flyover to connect BNSF trains to the riverside tracks
3️⃣ A 3-mile tunnel under Clinton and Roosevelt to connect MED to UP-N/NW
1️⃣ Reconfiguration of the A-2 Interlocking
2️⃣🅰️ Direct RI-CUS connection with riverside thru-running
2️⃣🅱️ Flyover to connect BNSF trains to the riverside tracks
3️⃣ A 3-mile tunnel under Clinton and Roosevelt to connect MED to UP-N/NW