In Queenstown, challenging terrain called for a retaining wall solution that was not only strong and reliable but also flexible and environmentally friendly.
Severe yearly scour and flooding at a high-tension power line near Baltimore exposed the footing of a transmission tower, threatening critical infrastructure.
For walls between 2–4 ft (0.6–1.2 m) → Our Tie Back method comes into play. Every second row, every second bag is rotated perpendicular to the wall face, locking the structure into the backfill zone for added stability.
The construction of a new box culvert system and Flex MSE Green Wall at Rae Creek in Silverdale (part of the Loftus Village development) has really taken shape this summer.
🚒🌿 Burnaby Fire Hall No. 8 – Built from the Ground Up 🌿🚒
The construction of Burnaby Fire Hall No. 8 represents a landmark project for the City of Burnaby — transforming a bare plot of land into a vital community hub.
🌿 Nature Meets Function at the Fraser Valley Trout Hatchery 🌿
This ditch stabilization project at the Fraser Valley Trout Hatchery showcases how Flex MSE is supporting vegetation, controlling erosion, and protecting freshwater ecosystems.