•separated the hallway and bathroom
•drilled holes for the ventilation tubes
•continue covering up the isolated walls
•had a plasterer over to plaster the non-isolated walls
•separated the hallway and bathroom
•drilled holes for the ventilation tubes
•continue covering up the isolated walls
•had a plasterer over to plaster the non-isolated walls