If I were building a 300-500 MW AI campus today (Jan 2026), I’d trust a well-executed hybrid setup far more than relying solely on the grid.
#AIPower #DataCenters #GridInterconnection #EnergyInfrastructure
If I were building a 300-500 MW AI campus today (Jan 2026), I’d trust a well-executed hybrid setup far more than relying solely on the grid.
#AIPower #DataCenters #GridInterconnection #EnergyInfrastructure
#GreenHydrogen #DigitalTwins #LCOH #HydrogenEconomy
#GreenHydrogen #DigitalTwins #LCOH #HydrogenEconomy
In the 2026 reality, a green hydrogen project without a robust Digital Twin faces higher costs, greater uncertainty, and tougher financing in an increasingly competitive market.
#GreenHydrogen #DigitalTwins #AIinEnergy #HydrogenEconomy
In the 2026 reality, a green hydrogen project without a robust Digital Twin faces higher costs, greater uncertainty, and tougher financing in an increasingly competitive market.
#GreenHydrogen #DigitalTwins #AIinEnergy #HydrogenEconomy
The future of AI at scale will belong to those who solve power generation and distribution first. What are your thoughts on bridging the AI energy gap?
substack.com/@theaicomput...
The future of AI at scale will belong to those who solve power generation and distribution first. What are your thoughts on bridging the AI energy gap?
substack.com/@theaicomput...
For a decade, progress scaled at the speed of code. In 2026, it scales at the speed of the power grid.
Read the full issue #1 below 👇
open.substack.com/pub/theaicom...
For a decade, progress scaled at the speed of code. In 2026, it scales at the speed of the power grid.
Read the full issue #1 below 👇
open.substack.com/pub/theaicom...