10. Parts are identified and sent up a conveyor and picked up by the designated robot
11. If you can spit out 50 parts a minute, each robot has 30 seconds to drop off the part in its 120 square grid
12. 50x60x24= 72,000 parts a day
10. Parts are identified and sent up a conveyor and picked up by the designated robot
11. If you can spit out 50 parts a minute, each robot has 30 seconds to drop off the part in its 120 square grid
12. 50x60x24= 72,000 parts a day
6. Along one edge there is a single square set up for bagging
7. Make 25 robots with 2 pairs of 12" long tracks in X & Y directions (or something)
8. Each robot has a scoop or vacuum for grabbing & releasing bricks
6. Along one edge there is a single square set up for bagging
7. Make 25 robots with 2 pairs of 12" long tracks in X & Y directions (or something)
8. Each robot has a scoop or vacuum for grabbing & releasing bricks