Authored by theGradyConnell.bsky.social & Josh Rogerson.
Email: [email protected]
nztransitbuzz.substack.com
MORE: www.fasttrack.govt.nz/projects/nor...
MORE: www.fasttrack.govt.nz/projects/nor...
The mural is part of KiwiRail's beautification pilot to reduce tagging on graffiti hotspots.
The mural is part of KiwiRail's beautification pilot to reduce tagging on graffiti hotspots.
This stop is in place until the stop nearby the station opens later this year.
This stop is in place until the stop nearby the station opens later this year.
The ironwork and the timber facia along the length of the canopy was damaged and will need to be repaired.
The ironwork and the timber facia along the length of the canopy was damaged and will need to be repaired.
The mural connects with an earlier mural on the opposite side of the Station Road bridge and is designed to reduce graffiti.
The mural connects with an earlier mural on the opposite side of the Station Road bridge and is designed to reduce graffiti.
Also, a green grass seed-looking dust has been set down outside the station; this is a dust suppressant.
Also, a green grass seed-looking dust has been set down outside the station; this is a dust suppressant.
Final touches across the station's various areas, including around the escalators, plaza, and ticket hall.
The streetscape and green spaces are almost complete.
Final touches across the station's various areas, including around the escalators, plaza, and ticket hall.
The streetscape and green spaces are almost complete.
The works are part of ongoing maintenance works.
Trams are expected to be back on track from February 14.
The works are part of ongoing maintenance works.
Trams are expected to be back on track from February 14.
KiwiRail’s Chief Metro Officer David Gordon issued the following statement about the track issue in the Parnell tunnel which was resolved overnight.
KiwiRail’s Chief Metro Officer David Gordon issued the following statement about the track issue in the Parnell tunnel which was resolved overnight.
Auckland Transport issued an update at 5:41 am, announcing the track issue had been resolved and normal service would resume for the morning peak.
Auckland Transport issued an update at 5:41 am, announcing the track issue had been resolved and normal service would resume for the morning peak.
KiwiRail has issued a statement about the track issue detailing that it discovered faulty track work carried out by contractors in the tunnel over the Waitangi Weekend network closure.
Track assessments are underway with no scheduled repair estimate.
KiwiRail has issued a statement about the track issue detailing that it discovered faulty track work carried out by contractors in the tunnel over the Waitangi Weekend network closure.
Track assessments are underway with no scheduled repair estimate.
The Western and Southern lines will terminate at Newmarket and run to a 20 minute frequency.
The Western and Southern lines will terminate at Newmarket and run to a 20 minute frequency.
The station shelter has had part of its roof removed likely to connect the new bridge roof to it.
The station shelter has had part of its roof removed likely to connect the new bridge roof to it.
WCC have not specified what the fault was.
WCC have not specified what the fault was.
Read the Weekly Review now: nztransitbuzz.substack.com/p/weekly-rev...
Read the Weekly Review now: nztransitbuzz.substack.com/p/weekly-rev...
AT2 has been spotted on API Trackers with the name Te Waiarohia.
AT2 has been spotted on API Trackers with the name Te Waiarohia.
The monitoring of weather conditions & river levels has been essential in ensuring a safe, smooth, and successful work programme so far.
The monitoring of weather conditions & river levels has been essential in ensuring a safe, smooth, and successful work programme so far.
The arrival of the 23rd train of batch 3 takes Auckland's total electric train fleet to 95.
The final train to arrive is numbered AM1249.
The arrival of the 23rd train of batch 3 takes Auckland's total electric train fleet to 95.
The final train to arrive is numbered AM1249.
Commuter fares will increase by a range of 3.6% to 3.9%.
MORE: www.fullers.co.nz/news-updates...
Commuter fares will increase by a range of 3.6% to 3.9%.
MORE: www.fullers.co.nz/news-updates...
AM198 is likely undergoing a refurbishment, as the unit is one of the original EMU units delivered in batch 1.
PICS - @maxie_poo3 on X.
AM198 is likely undergoing a refurbishment, as the unit is one of the original EMU units delivered in batch 1.
PICS - @maxie_poo3 on X.