SPACE for Heaton
@spaceforheaton.com
96 followers 52 following 96 posts
We want a safer, healthier, happier Heaton. Making it easier to walk and cycle: another way is possible... www.spaceforheaton.com sensors.spaceforheaton.com
Posts Media Videos Starter Packs
Reposted by SPACE for Heaton
livingstreets.bsky.social
Does this look familiar? 🤔
We're sharing some of the worst pavement parking pics uploaded by the public on our interactive map 📍 Help us to find the worst pavement parking hotspots in England by adding your photos here 👉 https://t.co/xwrtQ8M4Dl https://t.co/lzypLtsrWK
A rogues gallery featuring four individual images of vehicles parked on the pavement. One image shows a person walking with a pushchair into the road.
Reposted by SPACE for Heaton
sensors.spaceforheaton.com
24h average NO2 readings for Wed 24th Sep 2025
Gosforth: 32.21µg/m³
Coast Road: 24.46µg/m³
Tyne Bridge: 36.71µg/m³

https://sensors.spaceforheaton.com
The image is a chart of nitrogen dioxide on specific dates, with the values in micrograms per metre cubed. The data is as follows.
18-09-2025: 8.91.
19-09-2025: 9.75.
20-09-2025: 14.38.
21-09-2025: 7.7.
22-09-2025: 11.98.
23-09-2025: 24.15.
24-09-2025: 32.21.
The image is a chart of nitrogen dioxide on specific dates, with the values in micrograms per metre cubed. The data is as follows.
18-09-2025: 18.65.
19-09-2025: 18.46.
20-09-2025: 13.39.
21-09-2025: 5.87.
22-09-2025: 17.65.
23-09-2025: 18.2.
24-09-2025: 24.46.
The image is a chart of nitrogen dioxide on specific dates, with the values in micrograms per metre cubed. The data is as follows.
18-09-2025: 13.89.
19-09-2025: 16.15.
20-09-2025: 19.34.
21-09-2025: 12.22.
22-09-2025: 22.21.
23-09-2025: 29.03.
24-09-2025: 36.71.
spaceforheaton.com
It's clear what the problem is on the Coast Road in Newcastle, where buses are frequently delayed by drivers.
Will the Movement Strategy that is due to be discussed by Cabinet next week address this, or will the problem be left for the future again?
Three buses held up in traffic on the Coast Road in Heaton, Newcastle upon Tyne.
spaceforheaton.com
Although air quality on the bridge was getting worse yesterday, the absence of vehicles for a few hours today saw things improve so the runners got cleaner air to breathe on their journey to the coast.
The image is a chart of nitrogen dioxide on specific dates, with the values in micrograms per metre cubed. The data is as follows.
31-08-2025: 14.35.
01-09-2025: 16.18.
02-09-2025: 25.25.
03-09-2025: 22.53.
04-09-2025: 21.35.
05-09-2025: 25.32.
06-09-2025: 33.53. The image is a line chart of air pollution on the Tyne Bridge. There is a noticeable dip when the Great North Run is taking place and people replace vehicles.
spaceforheaton.com
It's been a busy day on the Tyne Bridge as it sees it's most efficient use of the year, with 60,000 people crossing in around two hours and road works to clear and reinstate to give the runners extra space.
Reposted by SPACE for Heaton
livingstreets.bsky.social
5 years ago, the Government consulted on how dangerous pavement parking could be tackled in England. The Government has yet to respond. If pavement parking is a problem in your area, fill out our form and add to our map of danger hotspots across the UK act.livingstreets.org.uk/page/176767/...
Map pavement parking hotspots
Five years ago, the Government consulted on how the dangerous practice of pavement parking could be tackled in England. The Government has yet to respond. Together we want to show how pavement parkin...
act.livingstreets.org.uk
spaceforheaton.com
You can still cross the motorway, but need to go down the first ramp, then cross Market Street at a temporary crossing rather than down the stairs.
spaceforheaton.com
Pedestrian diversions in place if you are walking to or from the City Centre via New Bridge Street.
chroniclelive.co.uk
Newcastle City Council has closed the spiral staircase on New Bridge Street West in the city centre and part of the footbridge which runs across the Central Motorway
Bridge over Newcastle Central Motorway partly shut closed off due to 'fault'
Bridge over Newcastle Central Motorway partly shut closed off due to 'fault'
www.chroniclelive.co.uk
Reposted by SPACE for Heaton
mikecookson.bsky.social
Reminder that the top of Warwick Street will be closed for roadworks this coming weekend.

The number 1 will be on diversion and please allow extra time for your journey if you're driving.

Access for walking and cycling will be maintained.

Causeway one.network share.google/JTZL1JyonF63...
spaceforheaton.com
Some good news 👇🏽
newcycling.bsky.social
The council have now opened this route. Thank you to those in the council and @mikecookson.bsky.social for getting this fixed. The signs are still in place but can be ignored.

Let us know if you see issues like this wherever you cycle. It can be fixed!
newcycling.bsky.social
Still no update on this unfortunately. Some Cyclists dismount signs have been quickly put up.

This is discriminatory to those with mobility cycles and blocks larger cargo bikes.

A safe diversion needs to be in place or the fencing moved.
Reposted by SPACE for Heaton
newcycling.bsky.social
Still no update on this unfortunately. Some Cyclists dismount signs have been quickly put up.

This is discriminatory to those with mobility cycles and blocks larger cargo bikes.

A safe diversion needs to be in place or the fencing moved.
Picture of a red traffic sign with a printed bit of red paper saying "Cyclists dismount and use footpath"
A 6ft metal fence is in the background with a blue cycling sign pointing towards it.
Reposted by SPACE for Heaton
mikecookson.bsky.social
Just to confirm that we've not been consulted about these works, but have contacted Senior Officers within the Council tonight to try to get some answers.

There's no formal road closure, no planning consent for a project, no diversion. The barriers aren't Chapter 8 compliant.

It's unacceptable.
spaceforheaton.com
Somebody has fenced off the main cycle route from Heaton to the city centre, with no warning and no diversion.
It's possible to get though via the bin area of Shieldfield House then through a private car park back to the road.
Councillors are aware and are try to sort it.
spaceforheaton.com
It also fences off the pedestrian route so everybody is squeezed into a very narrow space, so look out for other people while trying to get past and be patient with each other.
spaceforheaton.com
Somebody has fenced off the main cycle route from Heaton to the city centre, with no warning and no diversion.
It's possible to get though via the bin area of Shieldfield House then through a private car park back to the road.
Councillors are aware and are try to sort it.
Reposted by SPACE for Heaton
saskiaheijltjes.bsky.social
🚲 Kidical Mass is growing fast – now 50+ groups across the UK!

We’ve launched a crowdfunder to continue to provide public liability & volunteer insurance for all KM groups in the UK. Target: £2,522.

Please donate!
👉 www.crowdfunder.co.uk/p/km-insurance

#KidicalMass #SafeStreetsNow
Kidical Mass Insurance
Insurance for 2025-2026 will be £2,521.42 for all Kidical Mass groups in the UK. This is for public liability and cover for our volunteers.
www.crowdfunder.co.uk
spaceforheaton.com
The first day of the Central Motorway being down to one lane northbound has so far seen journey times the same as they were before work on the Tyne Bridge started.
The image is a chart of journey time on the Central Motorway before work started on the Tyne bridge and today. The two live track each other closely.
Reposted by SPACE for Heaton
sensors.spaceforheaton.com
24h average NO2 readings for Wed 13th Aug 2025
Gosforth: 36.19µg/m³
Coast Road: 48.51µg/m³
Tyne Bridge: 39.71µg/m³

https://sensors.spaceforheaton.com
The image is a chart of nitrogen dioxide on specific dates, with the values in micrograms per metre cubed. The data is as follows.
07-08-2025: 7.47.
08-08-2025: 5.52.
09-08-2025: 6.69.
10-08-2025: 6.95.
11-08-2025: 13.71.
12-08-2025: 32.01.
13-08-2025: 36.19.
The image is a chart of nitrogen dioxide on specific dates, with the values in micrograms per metre cubed. The data is as follows.
07-08-2025: 24.45.
08-08-2025: 22.11.
09-08-2025: 20.15.
10-08-2025: 19.25.
11-08-2025: 24.75.
12-08-2025: 35.85.
13-08-2025: 48.51.
The image is a chart of nitrogen dioxide on specific dates, with the values in micrograms per metre cubed. The data is as follows.
07-08-2025: 13.7.
08-08-2025: 12.68.
09-08-2025: 11.62.
10-08-2025: 14.53.
11-08-2025: 20.08.
12-08-2025: 32.87.
13-08-2025: 39.71.
spaceforheaton.com
This images shows all the Stagecoach buses in Newcastle right now, carrying people to work and on other journeys, many of whom will have no other transport options.
sensors.spaceforheaton.com/bustracker
The image shows a maps of Newcastle upon Tyne with many buses shown in their current locations.
Reposted by SPACE for Heaton
nthtynecyclesoc.bsky.social
What better way to spend a warm summer’s evening than a pootle up and down the coast. Whitley Bay start, meet outside Spanish City at 6:30.
Whitley Bay’s Spanish City on a sunny day.
Reposted by SPACE for Heaton
nlandcc.bsky.social
The #NorthEastCombinedAuthority launched a survey to have your say on the future of online journey planning! We've made some suggestions to ensure that the whole journey lifecycle is considered - from the moment you leave the doorstep to when you arrive at your destination! 👉 tinyurl.com/25zvoqm9
Public transport journey planning
Take this survey powered by surveymonkey.com. Create your own surveys for free.
tinyurl.com
spaceforheaton.com
While road traffic increased by 5% last year, the number of people arriving into Newcastle by train decreased.

www.gov.uk/government/s...
A chart showing Percentage change in average daily arrivals into major cities in England and Wales (excluding London) on a typical day between autumn 2023 and autumn 2024.
The value for Newcastle is -11.3%
spaceforheaton.com
You'll be able to see how long it will take to drive along the Central Motorway when works starts using the queue tracker on our website.
sensors.spaceforheaton.com/tynebridge
The image is a chart showing two lines. One, in black, shows journey times before work on the Tyne Bridge started. The other, in orange, show the current journey time and is often above the black line.
Reposted by SPACE for Heaton
spaceforheaton.com
A new report from @ippr.org highlights that waiting for EVs to solve air quality problems on the Coast Road is likely to lead to bigger queues and leave people on the lowest income suffering even bigger delays on buses.
Read the full report at www.ippr.org/articles/the...
The image is a quote from the report reading "The Climate Change Committee forecasts that electrification of cars and the associated reduction in running costs will lead to up to a 51 per cent increase  
in traffic in England and Wales by 2050, and up to 10 million more cars on the  road (CCC 2025a). " The image is a chart from the linked report which shows over 40% of households on the lowest income quintile don't have access to a car.
spaceforheaton.com
A new report from @ippr.org highlights that waiting for EVs to solve air quality problems on the Coast Road is likely to lead to bigger queues and leave people on the lowest income suffering even bigger delays on buses.
Read the full report at www.ippr.org/articles/the...
The image is a quote from the report reading "The Climate Change Committee forecasts that electrification of cars and the associated reduction in running costs will lead to up to a 51 per cent increase  
in traffic in England and Wales by 2050, and up to 10 million more cars on the  road (CCC 2025a). " The image is a chart from the linked report which shows over 40% of households on the lowest income quintile don't have access to a car.